Education Products

A Beginner’s Guide to Mean Well Power Supplies for Bitcoin Home Mining

Real product photographs of MEAN WELL LRS-50-5, LRS-350-5, and LRS-600-12 power supplies on a charcoal studio surface.

Mean Well LRS supplies convert AC mains power into the DC voltage a Bitcoin miner needs, but they are power-supply components for qualified integration, rather than finished plug-in adapters. Choose the exact output voltage and load capacity, then account for the enclosure, grounding, wiring, connectors, protection, and cooling of the complete installation.

This guide covers the LRS-50-5, LRS-350-5, and LRS-600-12. It explains their ratings, terminal labels, load calculations, and manufacturer installation requirements so you can choose equipment and understand an installation plan. If you are new to mains wiring, a suitable finished adapter matched to your miner avoids assembling a mains-powered terminal system yourself.

Quick overview

  • Match the exact voltage: LRS-50-5 and LRS-350-5 provide 5 V DC; LRS-600-12 provides 12 V DC. A matching plug shape or familiar miner name is not enough to establish compatibility.
  • Read the model column: LRS-50-5 is rated 50 W at 10 A, LRS-350-5 is 300 W at 60 A, and LRS-600-12 is 600 W at 50 A, subject to their specified operating conditions.
  • Plan a complete system: Accessible AC terminals need a suitable end-system enclosure and protection, proper cord anchorage, protective earth, and an appropriate commissioning procedure.
  • Apply the actual limits: Temperature, input voltage, mounting, conductors, connectors, and branch protection can constrain the installation before the PSU’s total wattage does.
  • Keep 80% rules distinct: US continuous-load circuit sizing, optional PSU reserve, and Mean Well’s specific multiwire derating instruction are different requirements.
  • Use the official documents: The installation manual and three series datasheets are available below as searchable PDFs, alongside links to MEAN WELL’s originals.

What Is a Mean Well LRS Power Supply?

A Mean Well LRS is an enclosed switching power-supply component that converts its specified AC input into a regulated DC output. Its metal case covers the internal electronics, but the component still requires integration into a suitable finished system.

Your wall circuit supplies AC; the miner uses DC at the voltage specified for its board. The PSU’s available current is capacity, not a current that it automatically forces through the miner. A compatible load draws the current it requires, while a high-capacity supply also makes correct fault protection and distribution important.

Match voltage, polarity, connector dimensions and rating, and the full expected load. A 12 V supply must not be connected to a 5 V miner simply because the connector fits. Read the exact board’s documentation, including any hardware revision or manufacturer-specific input arrangement.


Which Mean Well Model Fits Your Mining Setup?

The two 5 V models serve compatible 5 V loads, while the LRS-600-12 serves compatible 12 V loads. Select between them using the complete installation’s required output, current, cooling, and derating, rather than a guaranteed miner count.

Model ratings from the MEAN WELL series datasheets. Available output depends on the documented operating conditions.
Exact model DC output Rated output AC input Cooling
LRS-50-5 5 V, 10 A 50 W 85–264 V AC, full range Convection; no fan
LRS-350-5 5 V, 60 A 300 W 90–132 / 180–264 V AC, selected by switch Built-in fan with on/off control
LRS-600-12 12 V, 50 A 600 W 90–132 / 180–264 V AC, selected by switch Built-in fan with on/off control

The “350” in the LRS-350 series name does not make its 5 V variant a 350 W supply: 5 V × 60 A = 300 W. Likewise, read the exact voltage column in every series datasheet rather than transferring another variant’s rating.

LRS-50-5: A Compact 5 V Component

The LRS-50-5 provides up to 10 A at 5 V under its specified conditions. It is a compact fanless option for an appropriately sized 5 V load, but its thermal and input-voltage derating still apply.

MEAN WELL LRS-50 power supply showing its metal enclosure, ventilation, label, and terminal block.
MEAN WELL LRS-50-5. Check the label and documentation for the exact unit.

A Bitaxe Gamma can be a 5 V application when its exact board, settings, cable, and connector match the installation design. A 50 W nameplate does not establish a permissible overclock or a safe current for every barrel connector. The LRS-50-5 listing describes the supply and included equipment.


LRS-350-5: More 5 V Current Capacity

The LRS-350-5 provides up to 60 A at 5 V, or 300 W, under its specified conditions. This makes it suitable for larger properly engineered 5 V loads, not an automatic authorization to connect a fixed number of miners.

MEAN WELL LRS-350 power supply showing its metal enclosure, ventilation, label, and terminal block.
MEAN WELL LRS-350-5. Check the label and documentation for the exact unit.

With several miners, the distribution system must accommodate the total current and protect each lower-current branch. Multiple output terminals are not individually isolated supplies or evidence that each terminal may carry the whole 60 A. See the LRS-350-5 product details for the exact component.


LRS-600-12: A Higher-Capacity 12 V Component

The LRS-600-12 provides up to 50 A at 12 V, or 600 W, under its specified conditions. Compatible 12 V equipment can include a Bitaxe GT or an appropriate NerdQaxe++, with the actual configuration determining the load.

MEAN WELL LRS-600 power supply showing its metal enclosure, ventilation, label, and terminal block.
MEAN WELL LRS-600-12. Check the label and documentation for the exact unit.

“Heavily overclocked” is not a power specification. Use documented operating limits and verified loads rather than promising that four NerdQaxe++ units or six GTs will fit every installation. The LRS-600-12 listing identifies the component and purchase configuration.


Official Manuals and Datasheets

Use the MEAN WELL enclosed-type installation manual together with the datasheet for your exact series and output-voltage variant. The datasheets include ratings, terminal assignments, mounting drawings, protection behavior, and derating curves.

Official MEAN WELL documents, checked November 11, 2026. Hosted copies retain searchable text and the manufacturer’s drawings.
Document Hosted PDF Manufacturer source
Enclosed-type installation manual Open PDF: Enclosed-type installation manual
9 pages, 505 kB
MEAN WELL original: Enclosed-type installation manual
LRS-50 series datasheet Open PDF: LRS-50 series datasheet
4 pages, 647 kB
MEAN WELL original: LRS-50 series datasheet
LRS-350 series datasheet Open PDF: LRS-350 series datasheet
4 pages, 630 kB
MEAN WELL original: LRS-350 series datasheet
LRS-600 series datasheet Open PDF: LRS-600 series datasheet
4 pages, 596 kB
MEAN WELL original: LRS-600 series datasheet

Read the LRS-50-5, LRS-350-5, or LRS-600-12 column within its series document. Match the document and product label to the actual unit; the presence of component approvals does not by itself certify the complete assembled mining system.


What Does a Complete Installation Need?

A complete installation needs suitable enclosure and access protection, AC isolation and inlet protection, protective-earth bonding, secure mounting and cord anchorage, and a correctly rated DC distribution system. Attaching a cord to an otherwise accessible terminal block is not the finished installation described by the manufacturer.

Mean Well’s installation manual states that these enclosed components are installed inside the case of the end system. The finished design must also satisfy applicable electrical and product requirements for its location and use. Have mains-side design, assembly, and verification performed by someone qualified for that work.

Conceptual power-system diagram showing AC isolation, an LRS component, protective earth, and protected DC distribution to two miners.
Functional system diagram. The enclosure, input protection, grounding, and protected DC branches require a complete design; this is not a wiring plan.

Before installation or maintenance, disconnect the system from its supply, prevent inadvertent reconnection, and verify isolation using an appropriate procedure. Do not open the PSU case. Disconnecting a cord does not establish that every internal point is immediately safe, and an unlit LED is not a test for absence of hazardous voltage.

  • Enclosure and barriers: Prevent access to hazardous terminals and provide the required separation, ventilation, and fire protection.
  • Inlet and isolation: Use an appropriately rated input arrangement and protective devices for the finished system, with a defined means of disconnecting power.
  • Cord anchorage: Use suitable glands, clamps, or other designed anchorage so pulling or twisting the cord does not load the terminals. Cable ties for tidiness are not automatically adequate cord anchorage.
  • Mounting: Follow the case drawing’s screw-length limits and mounting requirements so a screw cannot contact internal components.
  • DC branches: Rate the distribution, protection, wiring, and mating connectors for each load and the available fault current.

What Do the Terminal Labels and Controls Mean?

L and N identify the AC input, FG identifies protective earth, and −V and +V identify the DC output. Confirm the numbered assignments and the physical orientation from the drawing for the exact model before any connection is made.

Logical numbered terminal assignments for LRS-50-5, LRS-350-5, and LRS-600-12.
Numbered assignments from the manufacturer’s mechanical drawings. This logical reference is not a physical left-to-right wiring view.
  • LRS-50-5: Pin 1 is AC/L, pin 2 is AC/N, pin 3 is FG, pin 4 is DC −V, and pin 5 is DC +V.
  • LRS-350-5 and LRS-600-12: Pin 1 is AC/L, pin 2 is AC/N, pin 3 is FG, pins 4–6 are DC −V, and pins 7–9 are DC +V.
  • Protective earth is distinct: FG is not neutral and should not be confused with the DC negative return. Any required bonding arrangement belongs to the complete system design.

Wire colors vary by country. Mean Well’s single-phase examples use black for line, white for neutral, and green for protective earth in North America; the European harmonized examples use brown, blue, and green/yellow. Identify conductors by their documented function and verification, rather than color alone.

Input Selection, Output Adjustment, and the LED

The LRS-350 and LRS-600 have an input-range selector; the LRS-50 uses a full-range input. The selector must match the incoming supply before energization and must not be changed while the system is energized.

The output adjustment is a limited trim, not a way to turn a 12 V PSU into a 5 V supply. The datasheets list 4.5–5.5 V adjustment for the two 5 V variants and 11.4–13.2 V for LRS-600-12. Those ranges describe the supply, not a miner’s permitted input range; the connected device may allow much less variation.

For LRS-600, the datasheet specifies that output-voltage adjustment may be operated with input at 100–120 V AC or 200–240 V AC. Use that model’s notes, rather than assuming every input voltage within the overall operating range permits adjustment. Adjustment and energized testing belong in a commissioning procedure with access protection in place.

The LED is an operating indicator. It does not replace a voltage measurement or prove that a disconnected or faulted unit is safe to touch internally.


How Should Wires and Terminal Connections Be Chosen?

Choose conductors, lugs, mating plugs, and protection for their actual current, temperature, installation conditions, voltage drop, and terminal compatibility. Use the manufacturer’s terminal and conductor instructions rather than “tighten firmly” or an assumed stacked-lug allowance.

The enclosed-type manual lists terminal screw sizes and suggested torque for the covered families, including the LRS models. Check the applicable table and any instructions supplied with the exact unit or terminal hardware. Use the specified torque and a compatible termination; do not substitute a general enclosure-mounting screw torque for a terminal value.

Do not assume that two ring lugs may always be stacked on a screw. The permitted conductor or lug combination must be supported by the terminal documentation. A tug check can reveal an obviously loose connection but does not establish correct torque, conductor suitability, or current capacity.

Use the correct preparation and crimp tooling, keep stray strands and exposed copper from bridging terminals, and support cables independently. A thicker conductor is not automatically a suitable replacement if the terminal or lug does not accept it.

Specific multiwire instruction: Mean Well’s installation-manual wire table says to derate each wire’s listed suggested current to 80% when five or more wires connect to the unit. Preserve that condition when using the table, and assess any other applicable installation or conductor derating. It is not a universal rule that 80% of any cable or connector label guarantees suitability.


How Many Miners Can One Supply Power?

The answer depends on the miners’ actual supported loads, the PSU’s available output after derating, and the complete distribution system. A wattage division gives a planning result, not a verified installation capacity.

  1. Identify each device: Record its exact board, input voltage, operating settings, expected sustained load, and any documented startup requirements.
  2. Determine available supply output: Apply the exact PSU’s input-voltage, temperature, mounting, and other relevant derating.
  3. Choose any additional reserve: If you adopt an 80% planning target, identify it as a design choice and apply it within the available operating envelope.
  4. Check every power path: Assess each branch, the total distribution current, wire runs, connectors, terminals, and protective devices.
  5. Verify the completed system: Commission within the approved design and reassess before adding miners or increasing their load.

Worked DC Load Examples

Use P = V × I and add the simultaneous DC loads; keep PSU output and wall input separate. These examples illustrate the arithmetic only and do not certify a particular set of miners or wiring.

  • One 30 W load at 5 V: 30 W ÷ 5 V = 6 A. An optional 80% target on an otherwise fully available 50 W supply is 40 W, but the 6 A branch still needs a suitable connector, cable, and protection.
  • Six 30 W loads at 5 V: 6 × 30 W = 180 W, or 36 A total. This is below the LRS-350-5’s 300 W nameplate, but it does not establish that one terminal, cable, or distribution arrangement can carry that current.
  • Six 80 W loads at 12 V: 6 × 80 W = 480 W, or 40 A total. Each branch is approximately 6.67 A. This equals an optional 80% target for a fully available 600 W output, leaving no extra reserve within that particular 480 W target.

Choosing five of the hypothetical 80 W loads reduces the calculated total to 400 W. That may leave more output reserve, but neither five nor six is a guaranteed safe count without the other checks. Overclocking, cooling changes, and firmware settings can change the load; use documented limits and verified operating data.

AC input power is higher than DC output power because conversion is not lossless, and AC current also depends on input voltage and power factor. Do not apply a DC-current calculation directly to the household circuit or assume a wall meter and device telemetry measure the same quantity.


Is 80% the Correct Limit for Everything?

No. US continuous-load circuit sizing, optional PSU reserve, and specific conductor derating instructions address different constraints. The applicable manufacturer conditions and electrical requirements determine the installation limits.

PSU Reserve and Manufacturer Derating

A supply’s rated output is specified for defined conditions; full-rated operation is not universally prohibited. Input voltage, ambient temperature, mounting orientation, cooling, and model-specific notes can reduce the available output.

The three datasheets provide separate derating and input-voltage curves. For example, a hotter installation or low input voltage can require less load than the nameplate rating permits under reference conditions. The LRS-600 curves also distinguish the 5 V variant from other outputs, so use the curve appropriate to LRS-600-12.

Additional reserve can be a sensible design preference, but it does not replace those curves. Nor does it authorize unspecified spikes above a supply’s ratings. Any overload or peak-load allowance must come from the exact model’s documentation and remain within the complete system’s limits.

Household Continuous Loads

For typical standard-rated US branch circuits, continuous-load sizing commonly leads to 12 A on a 15 A circuit or 16 A on a 20 A circuit. This is a circuit-sizing context, not a rule assigning the same percentage to every DC component worldwide.

Include other simultaneous loads on the circuit, and use the applicable local rules and equipment ratings. Schneider Electric’s explanation distinguishes standard 80%-rated breakers from properly applied 100%-rated equipment. The separate 80% rule guide explains the relationship between circuit sizing and DC supply planning.


What Should Be Checked Before Connecting the Miner?

The completed installation should be verified for correct input selection, protective-earth continuity, termination, insulation and access protection, DC voltage, polarity, and suitable protection before the miner is connected. Energized checks require an appropriate procedure and safe test access.

A qualified commissioning plan should identify the relevant instruments, their ratings and settings, and the intended test points. A multimeter alone does not make exposed mains terminals suitable for a beginner to work beside.

  • Before energization: Verify the installation while isolated, confirm the selector if present, inspect connections and barriers, and check the planned protective-earth and distribution arrangements.
  • Output verification: Confirm the required DC voltage and polarity at appropriately protected test points, including the load-end connector. Red and black cable colors alone do not establish its final polarity.
  • Adjustment if required: Follow the supply’s adjustment limits and the load’s permitted input range, with access protection maintained. Do not expose AC terminals simply to reach the adjustment.
  • Connecting the load: Isolate again before making or changing connections. The commissioning procedure must address stored energy and reconnection, rather than treating an LED as proof of isolation.
  • Operating checks: Confirm stable output, actual load, cooling, and component temperatures against the design limits using suitable methods. Do not use touching an energized assembly as a temperature test.

Record the configuration and results so an added miner, different PSU, or higher-power setting can be assessed against the original design. This is particularly important when a single supply feeds several independently connected loads.


How Should the Supply Be Mounted and Grounded?

Mount the supply in its intended orientation within the suitable end-system enclosure, keep ventilation unobstructed, and connect FG to protective earth as required. The finished arrangement must provide both cooling and protection from accessible hazardous parts.

The installation manual calls for 10–15 cm clearance when an adjacent device is a heat source. Follow the exact mounting drawing, allowable screw penetration, and derating curves, and keep miner exhaust from heating the PSU intake where possible. A ventilated location does not remove the need for access protection.

Keep the assembly dry and away from unsuitable flammable surfaces, liquids, pets, and children. Perform maintenance only with appropriate isolation, and do not push cleaning tools through the case or open the supply.

A proper protective-earth path supports protective disconnection if a relevant fault occurs; it is not a promise that every fault will trip a breaker. Do not remove the earth pin, treat neutral as protective earth, or assume a DC-negative connection substitutes for FG. Noise or grounding problems should be investigated within the complete system design rather than solved by removing protective earth.


When Should You Stop and Get Help?

Stop operation when there is smoke, a burning smell, damaged insulation, abnormal heating, repeated tripping, an unexplained voltage, or uncertainty about the wiring. Isolate at a safe accessible point and have the cause investigated before restarting.

A supply that shuts down or cycles may be responding to overload, temperature, or another fault, but the behavior depends on the model and condition. The datasheets describe different protection and recovery modes; a restart is not proof that the underlying problem has been removed.

  • No output: Investigate the input arrangement, selector, isolation devices, connections, and the supply’s documented protection behavior through a qualified procedure.
  • Voltage drop or unstable mining: Check the supported load, output voltage at the relevant points, wire length and cross-section, terminations, and connectors.
  • Hot wiring or connectors: Stop and assess current, contact condition, component ratings, and protection. A larger PSU or fuse is not a general fix.
  • Repeated breaker trips: Assess the full circuit load and fault condition. Do not repeatedly reset it or remove a protective device to keep mining.

For questions about the supplied product or included accessories, contact Solo Satoshi support. For mains installation and verification, use an appropriately qualified electrician or system integrator. Keep the actual cable and adapter specifications with the system documentation.


Frequently Asked Questions

To top